Hampton Downs Landfill

Project Overview

  • Hampton Downs Landfill required a large-scale stabilisation solution for both landfill capping and the development of new cells.
    The site posed unique operational challenges due to the high volume of ongoing traffic and activity associated with being a live landfill.
    Ensuring surface stability while maintaining daily operations was critical for both environmental compliance and site efficiency.

Scope

Long-term stabilisation and capping of landfill and new cell construction areas.
185,412m² treated at 2,500 kg/ha over 2 years.


The goal was to establish a durable and stable surface that could withstand ongoing landfill operations while meeting stringent environmental and structural requirements.

Our Solution

Stabi-Mulch  

 

  • Application rate 2500-3500kg/ha dependent on site specifics, slope gradient etc

  • A mix of Pasture seed blend, winter active species to encourage growth in the winter periods

  • Starter Fertilizer

  • Polymer to provide further temporary stabilisation

Challenges

  • Managing constant landfill traffic and vehicle movements

  • Maintaining access and safety within a live operating environment

  • Working around weather and scheduling constraints

  • Meeting environmental compliance while minimizing disruption

Results

  • Project completed efficiently and without operational delays

  • Stabilised surfaces that withstand heavy use and environmental exposure

  • Positive feedback on quality, professionalism, and final finish

20220210_092157.jpg
WhatsApp Image 2025-08-27 at 8.08.40 AM.jpeg

Eddie Smith, Enviro NZ

“I’m very happy with their professionalism as well as quality & strike achieved by their product.”
Page 7 HAMPTON DOWNS LANDFILL.jpeg
bottom of page