Hydro Mulching Projects

Our Projects

Subdivisions

Road Projects

Renewable Energy

20211020_093121_edited.jpg

Turitea Windfarm

Having had failed results with hydroseed with newspaper, hay mulch with tack, client came to Instant Green. Trialled site with Stabi-Mulch applied at 2500kg/ha on steep topsoil batter. Site receives 100mm of rain within 5 days of application with no erosion or sediment movement. Instant Green stabilised remaining 330,000m2 of project with Stabi-Mulch applied at 2500kg/ha.

Harapaki wind farm 3.jpg

Harapaki Windfarm

1,200,000m2 of Stabi-Mulch and Soil Blanket completed over 3 years, including through Cyclone Gabrielle. Applied Dust-Loc to Haul roads to reduce water cart needs and increase Hick Bros operator efficiency. Challenges onsite included snow through winter, mobilising tracked machines to access areas, achieving grass strike through winter, multiple 100mm rain events. Carbon footprint/carbon emissions reduced by 48% when using Stabi-Mulch, compared to imported hydro mulch alternatives.

Land Stabilisation & Slip Control

Stop Banks

bottom of page